• FDA Campus Loop Road Project
    total

    Construction of a new loop road for the FDA White Oak Campus and all associated sitework for the new campus buildings of CDER II, Southwest Parking Garage, CDRH, OC/ORA, and Building 1. Construction consisted of building & surface demolition; roadways;...

  • FDA East Access Road and Bridge
    total

    Construction of a multi-phase new access road and bridges connecting the FDA White Oak Campus to Cherry Hill Road. Construction consisted of building & surface demolition; roadways; earthwork; utility relocation for: electrical distribution, telecommunication...

  • WMATA Shop & Yards/Parking Garages
    total

    Design/Build construction of a new shop and yard facility used in maintenance and storage of Metro trains along with new parking garages. Construction consisted of building & surface demolition; roadways; earthwork; track work; shop facilities mass excavation;...

  • Coast Guard Headquarters/St....
    total

    Comprised of an 11-story office building, utility plant, and two sevenstory parking garages, the new 1.2 million square-foot U.S. Coast Guard Headquarters campus required an immense excavation and massive support of excavation, deep foundation, and global stability...

  • Vehicle Maintenance and...
    total

    Design/Build construction of a new Vehicle Maintenance and Instruction facility for the armored division being transferred from Fort Knox's, KY. Construction consisted of building & surface demolition; clearing and grubbing; roadways; hardstand; earthwork;...

  • Reconstruct Turf and Soil on the...
    total

    Description: Construction of storm water recycling system and upgrade of the turf and soil at the national mall. Construction consisted of demolition of surface demolition and existing utilities; storm water management piping, water mains; contaminated soil...

  • Tunjuelo
    total

    Construction of the second stage of the Interceptor Tunjuelo Medio Etapa II, that includes the videotaping of existing utilities, installation of 3966 meters of reinforced concrete pipe where installed.