Description: Construction of storm water recycling system and upgrade of the turf and soil at the national mall. Construction consisted of demolition of surface demolition and existing utilities; storm water management piping, water mains; contaminated soil abatement; cisterns for the storage of rain water; jack and bore of wet utilities underneath the existing road ways.