Vehicle Maintenance and Instructional Facility
Total
Description

Design/Build construction of a new Vehicle Maintenance and Instruction facility for the armored division being transferred from Fort Knox's, KY. Construction consisted of building & surface demolition; clearing and grubbing; roadways; hardstand; earthwork; facility mass excavation; utility relocation for: electrical distribution, telecommunication distribution, waterlines, and sanitary sewer systems; storm water management piping and systems; parking lots; contaminated soil abatement; and Unexploded Ordinance (UXO) management.

Subcontracted Work

100% of this contract was self-performed by Total. Tetra Tech provided all UXO consulting and management in conjunction with our daily work activities

Cost And Time Growth Discussion

N/A

Offeror's Role

Our role in this project was a design/assist subcontractor for Tetra Tech. The scope of our work included all roadway construction, utility installations, and associated site work including:

  • > Clear and grub
  • > Building/Surface Demolition
  • > Erosion and sediment controls
  • > Excavation of approximately 1,000,000 CY
  • > Grading of all paved areas, hardscape, and bridge approaches
  • > New roadway, sidewalk and curb/gutter
  • > Utility installations including:
    • Storm Drain RCP pipe ranging from 18" to 72”
    • DIP water pipe ranging from 6” to 16”
    • DIP sewer pipe ranging from 6” to 8”.
    • DIP force main sanitary sewer and lift stations
    • Electrical/Telecommunication ductbank installation
  • > Unexploded Ordinance, identification, safety procedures, and removal assistance in coordination with Tetra Tech
  • > Multiple storm water management ponds and all associated culverts and structures
  • > Soil Stabilization for roadway and structure by Lime (4%) for SC soil
  • > Contaminated soil abatement
Location
Fort Benning, GA
Project Owner

U.S. Army Corp of Engineers - Savannah District General Contractor:

Tetra Tech, Inc. Fred Parker 330 John Carlyle St, 3rd Floor Alexandria, VA 22314 (ph) 571-527-4440 (fax) 571-527-3838

Schedule

Start Date: October 20, 2008

Original Completion:
April 30, 2010

Final Completion
March 15, 2010

Months: 18

GSF/Mon: N/A

Cost

Original Cost: $6,940,000

Final Cost:$8,211,480

%Difference: 118%

%Gsf: N/A

Project Owners Acquisition Methodology

Delivery: CMAR

Procurement: Best Value Selection

Contracting: Lump-Sum

Bim Usage

Design: Yes

Construction: Yes

Related Projects
  • 9344 Lanham Sevem Road, Suite 210 Lanham, MD 20706
  • Call us: 301 459 7484
  • Call us: 703 928 8746
  • E-mail: contact@tcce.biz

Copyright 2014 :
Total Civil Construction